Research on Contact Wire Uplift of Typical High-speed Railway at 300km/h and 350km/h
2nd China International Youth Conference on Electrical Engineering
Zhang Wenxuan  Infrastructure Inspection Research Institute, China Academy of Railway Sciences Corporation Limited.;Mu Meijun  infrastructure inspection research institute, China academy of railway sciences corporation limited.
H /H3 2021年12月17日 10:00~10:15
仅限参会人 口头报告
Characteristics of Ultrasound Induced by Partial Discharge in Power Cable
2nd China International Youth Conference on Electrical Engineering
Han Da  North China Electric Power University
Z /Z10 2021年12月17日 15:50~15:55
仅限参会人 张贴报告
Tram Signal Priority Coordination Optimization Model for Long Tram Lines by Combining ASP and GWB schemes
The 20th and 21st joint COTA International Conference of Transportation Professionals
Wei Wei  School of Transportation and Logistics, Southwest Jiaotong University, Chengdu 610031, China
暂无会场信息
仅限参会人 张贴报告
Fast Transient Characteristics Induced by Breaker Operation in a Pumped Storage Power Plant
2nd China International Youth Conference on Electrical Engineering
Wang Wei  State Key Laboratory of Alternate Electrical Power System with Renewable Energy Sources, North China Electric Power University, Beijing P.R. China, 102206;
D /D5 2021年12月17日 09:00~09:15
仅限参会人 口头报告
移动端
在手机上打开
小程序
打开微信小程序
客服
扫码或点此咨询